欢迎进入Allbet官网。Allbet官网开放Allbet登录网址、Allbet开户、Allbet代理开户、Allbet电脑客户端、Allbet手机版下载等业务。

首页体育正文

新2最新网址(www.hg108.vip):Fukushima debris removal delayed by another year

admin2022-09-1819

新2最新网址www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

欧博网址:(www.aLLbet8.vip),欧博网址开放会员注册、代理开户、电脑客户端下载、苹果安卓下载等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

网友评论

2条评论